Well we’ve finally broken “ground” or… rather a few walls in the suites next door to triple the size of the existing datacenter (W00T!). We’ll be adding roughly 75-100 more cabinets, a new 1800W x 3 phase power feed, and upgrading our core switches to Foundry BigIron 40G’s (which have a backplane of around 5 Terabits per second…). I feel like a kid I’m so excited..
Pictures to follow tomorrow 🙂
-Scott